Total Count of Projects: 789
< Previos1213141516171819202122232425262728293031Next >

Address: 89 Niagara St Toronto, ON M5V 1C3

Approximately occupancy date:

Building size: 14

Builder: Aspen Ridge Homes

Project Description:

The Essery is a new condo development by Aspen Ridge Homes currently in preconstruction at 109 Niagara Street, Toronto.

 

Address: 70 Mississauga Rd South Mississauga, ON L5H 2H3

Approximately occupancy date:

Building size:

Builder: Diamondcorp and Dream and Fram + Slokker and Kilmer Group

Project Description:

Bridge House at Brightwater is a new condo development by Diamondcorp , Dream , Fram + Slokker and Kilmer Group currently in preconstruction at 70 Mississauga Road South, Mississauga.

 

Address: 206 King St West Hamilton, ON L8P 1A5

Approximately occupancy date:

Building size: 14

Builder: Canlight Realty Corp.

Project Description:

Radio Arts is a new condo development by Canlight Realty Corp. currently in preconstruction at 206 King Street West, Hamilton. Radio Arts has a total of 122 units. Sizes range from 363 to 1020 square feet.

 

Address: 3194 Dundas St W, Toronto, ON M6P 2A3

Approximately occupancy date:

Building size: 8

Builder: Gairloch Ltd.

Project Description:

Craft Residences is a new condo development by Gairloch currently in preconstruction at 3194 Dundas Street West, Toronto. Craft Residences has a total of 86 units.

 

Address: The Gore Rd & Queen St East Brampton, ON

Approximately occupancy date:

Building size: 35

Builder: Poetry Living and HBNG Holborn Group and TACC Developments

Project Description:

CityPointe Heights is a new condo development by Poetry Living , HBNG Holborn Group and TACC Developments currently in preconstruction at The Gore Road & Queen Street East, Brampton. CityPointe Heights has a total of 658 units.

 

Address: 490 St Clair Ave West Toronto, ON

Approximately occupancy date:2025

Building size: 33

Builder: Canderel Residential and KingSett Capital

Project Description:

Forêt is a new condo development by Canderel Residential and Kingsett Capital currently in preconstruction at 490 Saint Clair Avenue West, Toronto. The development is scheduled for completion in 2025. Forêt has a total of 1000 units.

 

Address: 1625 Military Trail Scarborough, ON M1C 1B3

Approximately occupancy date:2025

Building size: 8

Builder: Altree Developments

Project Description:

Highland Commons is a new condo development by Altree Developments currently in preconstruction at 1625 Military Trail, Toronto. Highland Commons has a total of 550 units.

 

Address: 151 City Centre Dr Mississauga, ON L5B 1M7

Approximately occupancy date:June 2024

Building size: 31

Builder: Camrost-Felcorp

Project Description:

Exchange Signature Residences is a new condo development by Camrost Felcorp currently in preconstruction at 151 City Centre Drive, Mississauga. The development is scheduled for completion in 2024. Exchange Signature Residences has a total of 250 units. Sizes range from 555 to 888 square feet.

 

< Previos1213141516171819202122232425262728293031Next >
ALL
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
Please note that content and information contained in this website is for demonstration purposes only and this website is trial website or test website and it can not be used for marketing purposes.