List of projects for '2027' (Approximate Occupancy date)
|
Total Count of Projects: 15
Address:
5160 Ninth Line, Mississauga, ON L5M 0R5
Approximately occupancy date:2027
Building size:
6
Builder:
Branthaven
Project Description:
High Line Condos is a new condo community by Branthaven currently in preconstruction at 5160 Ninth Line, Mississauga. High Line Condos has a total of 205 units.
Address:
145 Nipissing Rd, Milton, ON L9T 1R3
Approximately occupancy date:June 2027
Building size:
23
Builder:
Neatt Communities
Project Description:
Stationside is a new condo community by Neatt Communities currently in preconstruction at 145 Nipissing Road, Milton. Stationside has a total of 612 units.
Address:
164 Bathurst St, Toronto, ON M5V 2R3
Approximately occupancy date:Jan 2027
Building size:
18
Builder:
Originate Developments Inc and Harlo Capital
Project Description:
Reside on Richmond is a new condo community by Originate Developments Inc. and Harlo Capital currently in preconstruction at 627 Richmond Street West, Toronto. Reside on Richmond has a total of 217 units.
Address:
506 Church St, Toronto, ON M4Y 2C8
Approximately occupancy date:2027
Building size:
14
Builder:
Graywood Developments
Project Description:
Maison Wellesley Condos is a New Condo development by Graywood Developments Ltd. located at Church St & Wellesley St E, Toronto.
Address:
28 Park Rd, Toronto, ON M4W 2N2
Approximately occupancy date:2027
Building size:
29
Builder:
Capital Developments
Project Description:
Park Road, The Yorkville Flatiron, is set to make a bold architectural statement in the city’s iconic skyline. With its innovative design, sleek aesthetic, and prestigious location at the heart of Yorkville, this condominium promises to offer forever views at one premium address.
Address:
2746 Kingston Rd, Scarborough, ON M1M 1M7
Approximately occupancy date:2027
Building size:
23
Builder:
Skale Developments
Project Description:
Residences at Bluffers Park is a new condo community by Skale Developments currently in preconstruction at 2746 Kingston Road, Toronto.
Address:
250 King St E, Toronto, ON M5A 1K1
Approximately occupancy date:September 2027
Building size:
43
Builder:
Emblem Developments
Project Description:
ALLURE Condos is a new condo development by Emblem Developments currently in preconstruction at 250 King Street East, Toronto. ALLURE Condos has a total of 509 units.
Address:
Enterprise Boulevard & University Boulevard Markham L3R 2E4
Approximately occupancy date:September 2027
Building size:
40
Builder:
Metropia
Project Description:
UnionCity is a new condo development by Metropia currently in preconstruction at Enterprise Boulevard & University Boulevard, Markham.
Address:
225 John St S, Hamilton, ON L8N 2C7
Approximately occupancy date:2027
Building size:
27
Builder:
Slate Asset Management
Project Description:
Corktown is a new condo development by Slate Asset Management currently in preconstruction at 221 John Street South, Hamilton. The development is scheduled for completion in 2027. Corktown has a total of 719 units.
Address:
1474 Bayly St Pickering, ON L1W 1L8
Approximately occupancy date:2027
Building size:
37
Builder:
Chestnut Hill Developments
Project Description:
The Grand at Universal City is a new condo development by Chestnut Hill Developments currently under construction at 1474 Bayly Street, Pickering.
Address:
41 Wilson St Hamilton, ON L8R 1C6
Approximately occupancy date:2027
Building size:
31
Builder:
Emblem Developments
Project Description:
The Design District is a new condo development by Emblem Developments currently in preconstruction at 41 Wilson Street, Hamilton. The development is scheduled for completion in 2027. The Design District has a total of 931 units.
Address:
3320 Hwy 7 Vaughan, ON
Approximately occupancy date:2027
Building size:
56
Builder:
SmartLiving
Project Description:
Park Place is a new condo development by SmartLiving currently in preconstruction at Commerce Street & Highway 7, Vaughan. The development is scheduled for completion in 2027. Park Place has a total of 1111 units. Sizes range from 477 to 905 square feet.
Address:
33 Yorkville Ave
Toronto, ON M4W 1L1
Approximately occupancy date:Feb 2027
Building size:
68
Builder:
Pemberton Group
Project Description:
The Pemberton is a new condo development by Pemberton Group currently under construction at 33 Yorkville Avenue, Toronto. The development is scheduled for completion in 2027. The Pemberton has a total of 1144 units. Sizes range from 365 to 1125 square feet.
Address:
493 Main St South Brampton, ON L6Y 1N6
Approximately occupancy date:2027
Building size:
21
Builder:
i2 Developments
Project Description:
Stella Phase 2: A star is born at the SouthSide Community in South Brampton. Rising 21 storeys at the prime location of Steeles Avenue West and Hurontario, Stella is a 5-min walk to everything that matters. Sheridan College, Brampton Gateway Bus Terminal, future Hurontario LRT, Real Canadian Super Store, and much more.
Address:
454 Burnhamthorpe Rd West Mississauga, ON L5B 0E3
Approximately occupancy date:2027
Building size:
67
Builder:
Urban Capital Property Group and Rogers Real Estate Development Limited
Project Description:
M4 Condos is a new condo development by Urban Capital and Rogers Real Estate Development Limited currently in preconstruction at Burnhamthorpe Road West, Mississauga. M4 Condos has a total of 954 units. Sizes range from 420 to 1330 square feet.
|
|
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
|
|
|
|
|