|
Total Count of Projects: 806
Address:
4077 Hwy 7 Unionville, ON L3R 1L5
Approximately occupancy date:
Building size:
8
Builder:
Kingdom Developments
Project Description:
Highmount is a new condo development by Kingdom currently in preconstruction at 4077 Highway 7, Markham. Highmount has a total of 2100 units.
Address:
4050 Yonge St North York, ON M2P 2G2
Approximately occupancy date:
Building size:
28
Builder:
The Gupta Group
Project Description:
Yonge City Square Condos is a new pre-construction condo development by Gupta Group. Coming soon to Yonge Street and York Mills Road at 4050 Yonge Street in North York. The development will include a four-star hotel, office space, retail space, luxury condominiums, and 1.16 acres of conservation land.
Address:
Postridge Drive & Dundas Street East, Oakville, ON
Approximately occupancy date:2024
Building size:
8
Builder:
Greenpark
Project Description:
The Post is a new condo development by Greenpark Group currently in preconstruction at Postridge Drive & Dundas Street East, Oakville. The development is scheduled for completion in 2024. The Post unit sizes range from 473 to 843 square feet.
Address:
6036 Campbellville Rd Milton, ON L9T 2N7
Approximately occupancy date:2024
Building size:
Builder:
Royalpark Homes and Canvas Developments
Project Description:
This collection of townhomes and detached homes in Milton is for families who thrive on access to breathtaking natural spaces. Located within walking distance of Kelso Park, families will be able to enjoy year-round recreation including swimming, camping, skiing and tobagganing within the neighbourhood borders.
Address:
1792 Liverpool Rd Pickering, ON L1V 4G6
Approximately occupancy date:2028
Building size:
53
Builder:
Tribute Communities
Project Description:
VuPoint 2 Condos is a new condo development by Tribute Communities currently in preconstruction at Kingston Road & Liverpool Road, Pickering. VuPoint Condos has a total of 1318 units.
Address:
2450 Kingston Rd Scarborough, ON M1N 1V3
Approximately occupancy date:2025
Building size:
40
Builder:
Cliffside Homes
Project Description:
The Cliffton is a new condo development by Cliffside Homes currently in preconstruction at 2450 Kingston Road, Toronto. The development is scheduled for completion in 2025. The Cliffton has a total of 40 units.
Address:
990 Bloor St West Toronto, ON M6H 1L8
Approximately occupancy date:Summer 2025
Building size:
12
Builder:
Sierra Building Group
Project Description:
Motto Condos is a new condo development by Sierra Communities currently in preconstruction at 990 Bloor Street West, Toronto. The development is scheduled for completion in 2025. Motto Condos has a total of 89 units.
Address:
1300 Lakeshore Rd East Mississauga, ON L5E 3B8
Approximately occupancy date:Summer 2028
Building size:
19
Builder:
Tridel Corporation
Project Description:
Harbourwalk at Lakeview Village is a new condo development by Tridel currently in preconstruction at 1300 Lakeshore Road East, Mississauga. The development is scheduled for completion in 2028. Harbourwalk at Lakeview Village has a total of 863 units.
|
|
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
|
|
|
|
|
Listing added to your favorite list