|
Total Count of Projects: 812
Address:
5400 Yonge St North York, ON M2N 5R5
Approximately occupancy date:
Building size:
32
Builder:
Fieldgate Urban
Project Description:
5400 Yonge Street Condos is a new condo development by Fieldgate Urban currently in preconstruction at 5400 Yonge Street, Toronto. 5400 Yonge Street Condos has a total of 324 units.
Address:
1001 Sheppard Ave. East, North York, ON M2K 1C2
Approximately occupancy date:Summer 2022
Building size:
36
Builder:
Concord Adex
Project Description:
King's Landing is a new condo development by Concord Adex. King's Landing is nearby Ambrose Parkette and Bessarion, the project is estimated to be completed by 2022 and will be located on Concord Park Place Community at Esther Shiner Boulevard near the Bayview Village neighborhood in North York.
Address:
1285 Queen St E Toronto, ON M4L 1C2
Approximately occupancy date:
Building size:
6
Builder:
Fieldgate Urban
Project Description:
The Poet Condos is a new condo development by Fieldgate Urban currently in preconstruction at 1285 Queen Street East, Toronto. The Poet Condos has a total of 69 units.
Address:
533 King St W Toronto, ON M5V 1K4
Approximately occupancy date:
Building size:
16
Builder:
westbank and Allied Properties
Project Description:
King Toronto is a new condo development by Westbank and Allied Properties currently in preconstruction at 533 King Street West, Toronto. King Toronto has a total of 514 units.
Address:
3220 Sheppard Ave Escarborough, ON M1T 3K1
Approximately occupancy date:October 2020
Building size:
18
Builder:
Quadcam Development Group Incorporated
Project Description:
East 3220 Condos is a new condo development by Quadcam Development Group Incorporated currently in preconstruction at 3220 Sheppard Avenue East, Toronto. The development is scheduled for completion in 2020.
Address:
28 Widmer StToronto, ON M5V 2E7
Approximately occupancy date:January 2022
Building size:
48
Builder:
Plaza
Project Description:
Encore Theatre District Condos is a new condo development by Plaza currently in preconstruction at 28 Widmer Street, Toronto. The development is scheduled for completion in 2022.
Address:
2900 Hwy 7, Vaughan, ON L4K 0G3
Approximately occupancy date:
Building size:
60
Builder:
Cortel Group
Project Description:
CG Tower Condos is a new condo development by Cortel Group currently in preconstruction at Vaughan. CG Tower Condos has a total of 507 units.
Address:
139 Church St Toronto, ON M5B 1Y4
Approximately occupancy date:
Building size:
49
Builder:
Pemberton Group
Project Description:
139 Church Street Condos is a new condo development by Pemberton Group currently in preconstruction at 139 Church Street, Toronto. 139 Church Street Condos has a total of 414 units.
|
|
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
|
|
|
|
|
Listing added to your favorite list